B2-R1: Coupled

B2-R1: Coupled

Wednesday 6/10/2026, 2:15pm - 4:15pm, Breakout Room 1

Breakouts_Floor_Plan.jpg

Jun 10, 2026 Breakout #1 - Room 1

Wednesday, 2:30 - 4:30pm

Coupled Group

Agenda (tentative)

2:30pm - Invited ecosystem presentation (12+3 min)

  • Integrating the River Dynamical Core (RDycore) into E3SM: Status and Recent Developments (Gautam Bisht)

2:45pm - Lightning talks (5+2 min, order subject to change)

  • 2:45pm v3.LR Large Ensemble Overview (Wuyin Lin)

  • 2:52pm Two Decades of Regional and Seasonal U.S. Dust Trends from Observations and E3SMv3 (Yan Feng)

  • 2:59pm Characterization of Marine Heat Waves in v3.LR (Alice Barthel)

  • 3:06pm E3SMv3 Regionally Refined Model (Qi Tang)

  • 3:13pm v3.LR historical with irrigation on Tian Zhou

  • 3:20pm v3.HR simulation campaign (Xue Zheng, presented by Chris Golaz)

  • 3:27pm AMOC in v3.HR (Carolyn Begeman, Luke Van Roekel)

  • 3:35pm Analysis of surface dimming and brightening (Kai Zhang)

3:45pm - v4 discussion (45 min)

  • Performance comparison from Shixuan

  • Latest coupled v4 simulation (RASM1 vs RASM2, and stability)

  • Benchmarking Aurora and Frontier for coupled v4 dev

    • Case: v3.ne256.wcycl on Aurora (128 nodes)

    • Case: v3.ne256.wcycl on PM-GPU (64 nodes)

    • PM-GPU 128 nodes with RASM2 (offload atm, stacked others) TOT Run Time: 139279.082 seconds 191.055 seconds/mday 1.24 myears/wday CPL Run Time: 8950.846 seconds 12.278 seconds/mday 19.28 myears/wday ATM Run Time: 80989.158 seconds 111.096 seconds/mday 2.13 myears/wday LND Run Time: 7081.285 seconds 9.714 seconds/mday 24.37 myears/wday ICE Run Time: 35833.922 seconds 49.155 seconds/mday 4.82 myears/wday OCN Run Time: 72184.308 seconds 99.018 seconds/mday 2.39 myears/wday ROF Run Time: 707.586 seconds 0.971 seconds/mday 243.88 myears/wday GLC Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday WAV Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday IAC Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday ESP Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday CPL COMM Time: 52467.813 seconds 71.972 seconds/mday 3.29 myears/wday
      • Previous benchmarking results and scaling (on PM-GPU)

        #Nds|----SYPD---- | # | RASM | RASM | Diff # | OPT2 | OPT1 | 1v2 32 0.391 0.385 0.98 64 0.715 0.748 1.05 128 1.181 1.261 1.07 256 1.487 1.836 1.23
  • https://e3sm.atlassian.net/wiki/spaces/CNCL/pages/5502599219

  • v4 integration

Component/Feature

Status

Notes

Component/Feature

Status

Notes

MOAB

Ready for testing

Not all components

GLC

Ready for technical testing

Potential for improving North Atlantic; run sequential to land but parallel to ocn; no extra cost with RASM2;

Same configuration for all coupled resolution; initialization needs special consideration (for 1850/1950; available for 2010)

Unified mpas mesh

Not ready for testing

  • A candidate SCRIP mesh has been created, but we now need corresponding files to be able to run the model.

  • MOSART parameter file has been generated for this new candidate mesh.

  • ToDo:

    • ELM’s surface data and IC needs to be generated for this mesh.

    • Ocean IC file is also needed.

  • Potential issues

    • esmf_regridweightgenmight not be sufficient to generate the mapping files needed to for generating the ELM’s surface dataset and we may have to use the new mapping tool from Vijay M.

ZM

 

 

Three new land physics

Ready

  • Prognostic crop model

  • Irrigation

  • Plant hydraulics

 

 

 

 

 

 

Unified Surface Mesh: u.oi6to18.lr6to10

  • lnf / rof: nCells = 2121122

RASM2 coupling seuence

RASM2 Flow Chart.png