W4_MPAS-Ocean_Langmuir_turbulence
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
| Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
|---|---|---|---|---|---|---|---|---|
| Phase 1 - Component Level Development and Testing | ||||||||
| Design Document | W4_MPAS-Ocean_Langmuir_turbulence Design Document |
| 6/7/2019 |
| Mark Petersen | 10/1/2019 | ||
| Verification and Unit Tests | ||||||||
| Performance Assessment | Qing Li (Unlicensed) | W4_MPAS-Ocean_Langmuir_turbulence Performance Phase 1 | Mark Petersen | 10/1/2019 | ||||
| Validation Tests | Qing Li (Unlicensed) | 1/16/2019 | Mark Petersen | 10/1/2019 | ||||
| Issue Pull Request | Jon Wolfe | https://github.com/E3SM-Project/E3SM/pull/2952 | 5/30/2019 | |||||
| PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
| Phase 2 - Coupled System Integration and Testing | ||||||||
| Phase 2 Process Doc | Qing Li (Unlicensed) | W4_MPAS-Ocean_Langmuir_turbulence Design Document | 6/7/2019 | |||||
| Feature's Coupled Performance | Qing Li (Unlicensed) | W4_MPAS-Ocean_Langmuir_turbulence Performance Phase 1 | 6/7/2019 | |||||
| Feature's Coupled Validation | Qing Li (Unlicensed) | W4_MPAS-Ocean_Langmuir_turbulence Validation Phase 1 | 6/7/2019 | |||||
| Final Approval to part of ACME model | - | - | - | - | ||||
, multiple selections available, Use left or right arrow keys to navigate selected items