B6 - Plant Hydraulics Performance Phase 1

B6 - Plant Hydraulics Performance Phase 1

This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.

Summary

  • A two-year long simulation was performed with ELM+PHS. The test was performed on COMPY using compset ICLM45 and grid resolution ne30_oEC.

  • Simulation was completed with no numerical issues.

Performance Test 1

Performance Test 1: Two-year long simulation with ELM+PHS

Date last modified: Jun 27, 2019

Contributors: (add your name to this list if it does not appear)

Provenance: (Run provenance Link, Code Tag, etc:)

  • Test ran on COMPY

  • Run length = 2 years

  • Number of MPI Tasks = 128

  • Number of threads = 1

  • Hydrology model : Default ELM v0 model

Results: (link to results, data and plots)

 

Available on COMPY in file /compyfs/d3m045/global_run_clmphs_review/ICLM45/timing/e3sm_timing.ICLM45.1243.190627-160438

TOT Run Time

3459.374 seconds

4.739 seconds/mday

49.95 myears/wday

CPL Run Time

446.780 seconds

0.612 seconds/mday

386.77 myears/wday

ATM Run Time

376.393 seconds

0.516 seconds/mday

459.09 myears/wday

LND Run Time

2079.490 seconds

2.849 seconds/mday

83.10 myears/wday

ROF Run Time

213.133 seconds

0.292 seconds/mday

810.76 myears/wday

CPL COMM Time

1370.002 seconds

1.877 seconds/mday

126.13 myears/wday

:  

 



 

Comments