This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature. 

The first Dependencies Table provides information on features dependencies, lists expected Pull Request (PR) date (expected time this feature will be ready for integration), it also lists all the other known new code features that are blocking completion of this code. It lists all known features that depend on this feature being integrated. It also provides the date the PR was actually issued, the name of the integrator, the date the code was integrated and a hash/tag of the code integration into the ACME git repository. The information from this table feeds the overview table in the New Features Dependencies Overview page which is meant to be used by integrators to check the priority order in which the features should be integrated. It also provides an overview of all the new features and the expected integration dates. 

The second Checklist Table lists the code review steps to be taken in order. As you work on integrating your feature into ACME code, step along the Checklist table on your main page, obtain the approvals before going to the next step. For the phase 1 review, the Group Leads are the approvers, they can decide to sign on on the documentation or a verification step even if it is not completely finished, especially for the grandfathered features. The relevant documentation page does have to be created though and the explanation needs to be provided in Summary section as to why it is approved, what is the basis for approval. For example is there were tests performed on related feature and they proved indirectly that this feature works as expected, then the approver needs to document that. 

The Design Document page provides a description of the algorithms, implementation and planned testing including unit, verification, validation and performance testing. 

The Verification and Unit Testing page provides the short information and links to the tests that were performed, together with the links to the runs, their provenance and their results. The same information is called for in The Performance Assessment page and The Validation page in phase 1 of code review process. 

Dependencies Table for this feature

1.Design Doc

B5: Port iESM to E3SM Design Document

2.Owner

 @Katherine Calvin

3.PR Ready

 

4.Blocked By#

none

5.Affects #

none

PR Approved By

@...    

Date Approved

//...

6.Issued PR

...      (link to github PR)

7.PR Assignee

 

8.Integrated

 

9.Hash/Tag

 

10.Git Branch

 

 

 

Checklist for the Code Review Process for this feature

Action Required

Assignee - Task Owner

Link

Done ?

Done Date

Approved?

Approver

Approved Date

Notes

Action Required

Assignee - Task Owner

Link

Done ?

Done Date

Approved?

Approver

Approved Date

Notes

Phase 1 - Component Level Development and Testing

Design Document

 @Tim Shippert (Unlicensed)

B5: Port iESM to E3SM Design Document

 

 

 

 

Dec 6, 2017

Verification and Unit Tests

@Tim Shippert (Unlicensed)

B5 Port iESM to E3SM: Verification

 

 

 

 

 

 

Performance Assessment

@Tim Shippert (Unlicensed)

B5 Port iESM to E3SM: Performance Assessment

 

 

 

 

 

 

Validation Tests

@Tim Shippert (Unlicensed)

B5 Port iESM to E3SM: Validation

 

 

 

 

 

Issue Pull Request

 

 

 

 

 

 

 

 

PR Integrator

 

-

 

 

 

 

 

 

Phase 2 - Coupled System Integration and Testing

Phase 2 Process Doc

 

 

Feature's Coupled Performance

 

 

 

Feature's Coupled Validation

 

 

 

Final Approval to part of ACME model

 

-

-

-

-