O_23_O Coupling between GLC and OCN components
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
| Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
|---|---|---|---|---|---|---|---|---|
| Phase 1 - Component Level Development and Testing | ||||||||
| Design Document | O_23_O Coupling between GLC and OCN components Design Document |
|
| |||||
| Verification and Unit Tests | O_23_O Coupling between GLC and OCN components Verification Phase 1 | |||||||
| Performance Assessment | O_23_O Coupling between GLC and OCN components Performance Phase 1 | |||||||
| Validation Tests | O_23_O Coupling between GLC and OCN components Validation Phase 1 | |||||||
| Issue Pull Request | ||||||||
| PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
| Phase 2 - Coupled System Integration and Testing | ||||||||
| Phase 2 Process Doc | ||||||||
| Feature's Coupled Performance | ||||||||
| Feature's Coupled Validation | ||||||||
| Final Approval to part of ACME model | - | - | - | - | ||||
, multiple selections available, Use left or right arrow keys to navigate selected items