B13 MPAS-SI algal grazing
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
| Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
|---|---|---|---|---|---|---|---|---|
| Phase 1 - Component Level Development and Testing | ||||||||
| Design Document | Nicole Jeffery | B13 Generalize MPAS-SI Algal Grazing for Multiple Algal Groups: Design Document |
| 11/03/2020 |
| Katherine Calvin | ||
| Verification and Unit Tests | Nicole Jeffery | B13 MPAS-SI algal grazing: Verification | ||||||
| Performance Assessment | Nicole Jeffery | B13 MPAS-SI algal grazing: Timings | ||||||
| Validation Tests | Nicole Jeffery | B13 MPAS-SI algal grazing: Validation | ||||||
| Issue Pull Request | Nicole Jeffery | |||||||
| PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
| Phase 2 - Coupled System Integration and Testing | ||||||||
| Phase 2 Process Doc | ||||||||
| Feature's Coupled Performance | ||||||||
| Feature's Coupled Validation | ||||||||
| Final Approval to part of ACME model | - | - | - | - | ||||
, multiple selections available, Use left or right arrow keys to navigate selected items