W13: Linoz Diagnostics
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
| Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
|---|---|---|---|---|---|---|---|---|
| Phase 1 - Component Level Development and Testing | ||||||||
| Design Document | W13: Linoz Diagnostics Design Document | |||||||
| Verification and Unit Tests | Philip Cameron-Smith (Unlicensed) & Michael J Prather | W13: Verification for Linoz Diagnostics | ||||||
| Performance Assessment | Philip Cameron-Smith (Unlicensed) & Michael J Prather | W13: Performance Assessment for Linoz Diagnostics | ||||||
| Validation Tests | W13: Linoz Diagnostics Validation Phase 1 | |||||||
| Issue Pull Request | ||||||||
| PR Integrator | - | |||||||
| Phase 2 - Coupled System Integration and Testing | ||||||||
| Phase 2 Process Doc | ||||||||
| Feature's Coupled Performance | ||||||||
| Feature's Coupled Validation | ||||||||
| Final Approval to part of ACME model | - | - | - | - | ||||
For reference, the design document for Linoz is: A1 Ozone Hole (Linoz-v2)
, multiple selections available, Use left or right arrow keys to navigate selected items